{"id":58060,"date":"2018-05-25T08:51:04","date_gmt":"2018-05-25T08:51:04","guid":{"rendered":"http:\/\/www.elea.si\/portfolio\/reiseck-ii-pumped-storage-power-plant-reiseck\/"},"modified":"2018-06-21T10:15:28","modified_gmt":"2018-06-21T10:15:28","slug":"reiseck-ii-pumped-storage-power-plant-reiseck","status":"publish","type":"portfolio","link":"https:\/\/www.elea.si\/en\/portfolio\/reiseck-ii-pumped-storage-power-plant-reiseck\/","title":{"rendered":"Rei\u00dfeck II pumped storage power plant, Rei\u00dfeck"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"<p>iC consulenten ZT GmbH were entrusted with the execution design of the connecting pipeline from the headrace tunnel  of the Reisseck II pumped storage power plant to the existing pressurised pipeline  of the Rei\u00dfeck I power plant. The new pipeline has a diameter of 1,400 mm and a length of approximately 1,000 m. It is partly located within the access tunnel  and partly above ground. Elea iC provided their expertise in steel detailing and preparation of shop drawings.<\/p>\n<p>With its new pump storage power plant Rei\u00dfeck II, Verbund is expanding and modernising its existing Maltatal valley and Rei\u00dfeck power plants in Carinthia and turning them into one of the biggest and most productive hydropower plant groups in Europe.<\/p>\n<p>Pump storage plants like Rei\u00dfeck II are the ecologically and economically most sensible way to balance out the heavily fluctuating electricity production from wind and solar energy. As Rei\u00dfeck II will be operating together with the already existing storage power plants Malta and Rei\u00dfeck\/Kreuzeck, its interference with nature is limited to an underground headrace tunnel and machine and transformer caverns. The supply pipe and drainage are also placed underground.<\/p>\n","protected":false},"author":1,"featured_media":58038,"parent":0,"menu_order":27,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"portfolio_category":[92],"class_list":["post-58060","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio_category-structural-engineering"],"_links":{"self":[{"href":"https:\/\/www.elea.si\/en\/wp-json\/wp\/v2\/portfolio\/58060","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.elea.si\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/www.elea.si\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/www.elea.si\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.elea.si\/en\/wp-json\/wp\/v2\/comments?post=58060"}],"version-history":[{"count":1,"href":"https:\/\/www.elea.si\/en\/wp-json\/wp\/v2\/portfolio\/58060\/revisions"}],"predecessor-version":[{"id":58610,"href":"https:\/\/www.elea.si\/en\/wp-json\/wp\/v2\/portfolio\/58060\/revisions\/58610"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.elea.si\/en\/wp-json\/wp\/v2\/media\/58038"}],"wp:attachment":[{"href":"https:\/\/www.elea.si\/en\/wp-json\/wp\/v2\/media?parent=58060"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/www.elea.si\/en\/wp-json\/wp\/v2\/portfolio_category?post=58060"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}